Seattle Bathroom Remodel

This cozy bathroom remodel in Seattle completely transformed a 1940s space into a modern,
elegant retreat. We replaced the old bathtub with a walk-in shower finished in marble-look tile
and black hexagon flooring, added a convenient shampoo niche, and installed sleek glass doors. The remodel also included a new wood vanity with a quartz countertop, fresh tile flooring, new lighting and fixtures, drywall touch-ups, and a complete paint refresh — turning a dated bathroom into a timeless, comfortable space.

What we did

1. Bathroom Demolition and Garbage Disposal

We removed the old bathtub, surround walls, flooring, vanity, toilet, and medicine cabinet,
ensuring the space was fully cleared for the new layout and design. We disposed all the garbage related to the project.

Benefits:

Eliminated all outdated materials and potential water damage, allowing a clean foundation for
the new shower and fixtures while ensuring a smoother installation process.

2. Drywall Installation and Texturing

We installed new drywall where needed, repaired damaged areas, and applied smooth, consistent
texture to both walls and ceilings.

Benefits:

Created clean, flawless surfaces for painting and cabinetry, improved insulation, and provided a modern finished look.

3. Plumbing Installation and Upgrades

We installed new plumbing lines for the walk-in shower, toilet, and vanity, ensuring proper
water pressure and alignment for all new fixtures.

Benefits:

Improved water flow, reduced risk of future leaks, and ensured long-term reliability — a crucial step for any high-quality bathroom remodel.

4. Tile Prep and Waterproofing

We prepped the shower walls with HydroBoard, waterproofed with a professional-grade sealant,
and built the shower pan bedding using a sand mix sealed with Schluter Kerdi membrane. The bathroom floor was prepped with ¼” Fiberock board for added stability.

Benefits:

Provided superior moisture protection, increased tile adhesion, and created a solid, durable base for long-lasting tile performance.

5. Tile Installation

We installed 12×24 marble-look ceramic tiles on the shower walls, curb, and bathroom floor, complemented by matte black hexagon tiles on the shower pan and shampoo niche. Everything was grouted with Delorean Gray Prism grout and sealed with matching 100% silicone.

Benefits:

Delivers a luxurious, cohesive design that’s both easy to maintain and visually stunning. The contrast between marble and black tile gives this bathroom a timeless, high-end look.

6. Finish Work and Vanity Installation

We installed PVC baseboards, an Ariel American Oak solid wood vanity, and topped it with a 1.5-inch Edge Carrara White Quartz countertop.

Benefits:

Combines durability with style, adds storage and warmth through natural wood elements, and enhances the overall elegance of the space.

7. Painting and Finishing Touches

We completed the bathroom transformation with a full interior paint refresh. This included prepping and painting all walls, the ceiling, and baseboards using high-quality moisture-resistant paint designed specifically for bathrooms. Every surface was properly sanded, primed, and finished to achieve smooth, even coverage.

Benefits:

Creates a clean, polished look that enhances the brightness of the space, protects surfaces from humidity and everyday wear, and adds the final touch to complete this elegant bathroom remodel.

8. Fixtures and Lighting Installation

We installed a modern light fixture, LED medicine cabinet, towel warmer, and Delta shower and vanity trims — all selected for quality and modern design.

Benefits:

Improves everyday convenience, enhances lighting and comfort, and ties the entire bathroom together with matching finishes and functionality.

Timeline for Bathroom Remodel

Bathroom Demolition and Garbage Disposal

1-2 days

Drywall Installation and Texturing

1-3 days

Plumbing Installation and Upgrades

1-2 days

Tile Prep and Waterproofing

2-3 days

Tile Installation

3-5 days

Finish Work and Vanity Installation

1-2 days

Painting and Finishing Touches

1-2 days

Fixtures and Lighting Installation

1-2 days

Total Remodel Time: 1 month

This bathroom remodel in Seattle took approximately four weeks to complete, following about a week of design planning and material preparation. Before each project, we take time to finalize every detail to ensure a smooth build process and long-lasting results. The homeowners were delighted with their new walk-in shower and modern finishes — a complete transformation of a classic 1940s space into a stylish and comfortable retreat.

Gallery before and after project

Expert house remodeling contractor at work, delivering quality and precision on every project

//Real results speak for themselves

Our clients satisfied with their remodels

The best measure of success is what our clients say. Our customers love their remodels, and their voices share the proof.

//If there is a desire, there is always a way to make it happen

Work with remodeling pros. Expert advice. Quality results

We handle every detail — from concept to completion

Recent articles

Leave a request

Please fill out the form below or give us a call to schedule your free in-home consultation.

//Get a FREE QUOTE

Start building your better home

We’re a 5-star rated contractor on Google, Yelp, and Thumbtack — trusted by homeowners across the region




    Social media

    Free estimate

    Get a no-obligation price quote at no cost