This full kitchen renovation in Redmond completely transformed an outdated space into a modern, functional, and bright kitchen. We handled every stage of the remodel – from demolition and drywall to custom cabinetry, plumbing adjustments, tile flooring, painting, countertops, backsplash, and appliance installation – creating a space that perfectly blends design and practicality.
What we did
1. Kitchen demolition and garbage disposal
We began by removing the old kitchen cabinets, flooring, appliances, and soffits to create a blank canvas for the new layout. We disposed all the garbage related to the project.
Benefits:
Cleared outdated materials, improved layout potential, and allowed for a fresh start that matched the homeowner’s new design vision.
2. Drywall installation and texturing
We installed new drywall where needed, repaired damaged areas, and applied smooth, consistent texture to both walls and ceilings.
Benefits:
Created clean, flawless surfaces for painting and cabinetry, improved insulation, and provided a modern finished look.
3. Plumbing adjustment and replacement
We modified existing plumbing lines to fit the new cabinet and sink layout, and replaced all angle stops for better performance and safety.
Benefits:
Ensured efficient water flow, prevented future leaks, and made the kitchen fully compatible with the new layout.
4. Electrical upgrade and light fixture installation
We installed new ceiling lights, added lighting inside the pantry, and repositioned existing fixtures to provide optimal illumination.
Benefits:
Enhanced visibility, added warmth and ambiance, and improved energy efficiency with modern LED solutions.
5. Drywall installation and texturing
We replaced the kitchen window and sliding door with energy-efficient models. Adjustments
were made in the framing and siding to perfectly fit the homeowner’s desired sizes.
Benefits:
Improved natural lighting, enhanced insulation, and provided a sleek, modern look with proper waterproofing for long-term durability.
6. Tile floor installation
We prepped the subfloor using Schluter Ditra and Doctor Spin self-leveling system, then installed 12×24 porcelain tiles for a durable and elegant finish.
Benefits:
Ensures long-lasting stability, moisture resistance, and an easy-to-clean surface that adds
sophistication to the kitchen.
7. Custom cabinet installation
We installed locally built, custom kitchen cabinets designed specifically to meet the
homeowner’s needs and maximize storage efficiency.
Benefits:
We installed locally built, custom kitchen cabinets designed specifically to meet the
homeowner’s needs and maximize storage efficiency.
8. Professional painting
We painted the cabinets, walls, ceiling, and trim using premium Sherwin-Williams paint for a
flawless, durable finish.
Benefits:
Delivers a smooth, high-end appearance, protects surfaces from moisture and wear, and brightens the overall kitchen atmosphere.
We installed 3cm quartz countertops with a continuous design that seamlessly connects each piece for a polished, cohesive look.
Benefits:
Durable, stain-resistant, and easy to maintain — quartz adds both beauty and practicality to daily
kitchen use.
We installed a clean 3×6 tile backsplash using Laticrete epoxy grout, chosen for its superior stain resistance and long-term durability.
Benefits:
Adds a crisp, modern touch, protects the walls from moisture, and enhances the overall design
with simple elegance.
11. Kitchen appliance installation
We installed all new appliances, including a refrigerator, cooktop, microwave, and kitchen exhaust fan – ensuring each unit was properly connected and tested.
Benefits:
Provides reliable performance, energy efficiency, and completes the kitchen with a coordinated,
professional setup.
Timeline for Kitchen Remodel
Kitchen Demolition and Garbage Disposal
2-3 days
Drywall and Painting
1 week
Plumbing and Electrical Adjustment
1 week
Window and Sliding Door Replacement
2 days
Tile Work (floor & backsplash)
1 week
Cabinet & Countertop Installation
2 week
Kitchen Appliance Installation
1-2 days
Total remodel time: 2 months
This kitchen remodel took us two months to execute. Yet, there was about three weeks of prior planning. Before starting a new project we prefer to cover all the details and to make sure the execution of the project goes as planned and smooth. Our priority is customer’s satisfaction, which we achieved with this customer. They are very pleased with the result and recommended our company to their friends.
Gallery before and after project
Expert house remodeling contractor at work, delivering quality and precision on every project
//Real results speak for themselves
Our clients satisfied with their remodels
The best measure of success is what our clients say. Our customers love their remodels, and their voices share the proof.
//If there is a desire, there is always a way to make it happen
Work with remodeling pros. Expert advice. Quality results
We handle every detail — from concept to completion