Golden Remodel & Construction in Seattle, WA

Seattle Kitchen Remodel

This full kitchen renovation in Seattle transformed a century-old home’s kitchen into a beautiful blend of classic charm and modern functionality. We combined timeless elements with contemporary materials — from drywall and flooring to new lighting, cabinetry, and appliances — creating a bright, cohesive, and inviting space that honors the home’s history while meeting today’s lifestyle needs.

What we did

1. Kitchen Demolition and Trash Removal

We removed the old ceiling, partial walls, cabinets, flooring, and outdated appliances to prepare the space for a full remodel. We disposed all the garbage related to the project.

Benefits:

Opened up the layout for better design options, removed unsafe materials, and created a clean
foundation for new installations.

2. Drywall Installation and Finishing

We installed new drywall where necessary, followed by professional flat mudding to create a smooth, uniform finish on both walls and ceiling.

Benefits:

Provided a polished surface for painting, improved insulation, and refreshed the interior of this 100-year-old kitchen with a modern touch.

3. Plumbing Adjustment and Upgrades

We modified existing plumbing lines to fit the new cabinetry layout and replaced all angle stops to ensure safe, reliable water flow.

Benefits:

Improved water efficiency, reduced risk of leaks, and ensured all plumbing was aligned with the updated kitchen design.

4. Electrical Lighting and Fixture Installation

We installed new ceiling lights, added dedicated lighting above the sink area, and adjusted
existing fixtures for optimal illumination.

Benefits:

Brightened the entire space, improved visibility and functionality, and added warmth with modern, energy-efficient lighting solutions.

5. Kitchen Window Replacement

We replaced the old kitchen window and made framing and siding adjustments to fit the new,
larger design the customer wanted. Everything was carefully waterproofed for long-term protection.

Benefits:

Increased natural light, improved insulation, and enhanced both the exterior and interior
aesthetics of the kitchen.

6. Vinyl Flooring Installation

We secured and leveled the subfloor, eliminating squeaks before installing high-quality vinyl flooring for a durable, water-resistant finish.

Benefits:

Provides a smooth, quiet, and easy-to-clean surface that stands up to daily use while maintaining a timeless look.

7. Cabinet Installation

We installed new kitchen cabinets designed to meet all of the homeowner’s functional and aesthetic needs, maximizing storage and accessibility.

Benefits:

Offers efficient organization, a tailored design, and a high-quality finish that complements the kitchen’s modern style.

8. Professional Painting

We painted the walls, ceiling, baseboards, and trims using premium Sherwin-Williams paint for lasting color and durability.

Benefits:

Delivers a clean, fresh appearance, protects surfaces from wear, and ties together the entire kitchen design.

9. Quartz Countertop Installation

We installed 3cm quartz countertops with a carefully matched design that seamlessly connects all pieces for a refined and elegant finish.

Benefits:

Durable, heat- and stain-resistant, and easy to maintain — quartz brings beauty and practicality to everyday kitchen use.

10. Tile Backsplash Installation

We installed 2.5×8-inch tiles in a clean, linear pattern using Laticrete epoxy grout for superior stain resistance and longevity.

Benefits:

Adds a crisp, modern accent, protects walls from moisture, and enhances the overall kitchen design with subtle sophistication.

11. Kitchen Appliance Installation

We installed new Fisher & Paykel appliances, including a refrigerator, cooktop, microwave, and exhaust fan, ensuring all systems were properly fitted and tested.

Benefits:

Delivers premium performance, energy efficiency, and a coordinated look that completes this kitchen transformation.

Timeline for Kitchen Remodel

Kitchen Demolition and Garbage Disposal

2-3 days

Drywall and Painting

1 week

Plumbing and Electrical Adjustment

1 week

Window and Sliding Door Replacement

2 days

Tile Work (floor & backsplash)

1 week

Cabinet & Countertop Installation

2 week

Kitchen Appliance Installation

1-2 days

Total Remodel Time: 1.5 months

This kitchen remodel in Seattle took approximately seven weeks to complete, with about two weeks of planning and material coordination prior to starting. We take time before every project to confirm all details, ensuring a smooth workflow and quality results. Our top priority is customer satisfaction, and this Seattle homeowner was delighted with their new kitchen — a seamless blend of historical character and modern comfort.

Gallery before and after project

Expert house remodeling contractor at work, delivering quality and precision on every project

//Real results speak for themselves

Our clients satisfied with their remodels

The best measure of success is what our clients say. Our customers love their remodels, and their voices share the proof.

//If there is a desire, there is always a way to make it happen

Work with remodeling pros. Expert advice. Quality results

We handle every detail — from concept to completion

Recent articles

Leave a request

Please fill out the form below or give us a call to schedule your free in-home consultation.

//Get a FREE QUOTE

Start building your better home

We’re a 5-star rated contractor on Google, Yelp, and Thumbtack — trusted by homeowners across the region




    Social media

    Free estimate

    Get a no-obligation price quote at no cost